The first batch of results returned higher grade than expected from within the pit optimization shell. Highlights such as 10.6 g/t Au over a true width of 21.7 meters in drill hole SGRC1572 and 14.9 g/t Au over a true width of 14 meters.
The first batch of results returned higher grade than expected from within the pit optimization shell. Highlights such as 10.6 g/t Au over a true width of 21.7 meters in drill hole SGRC1572 and 14.9 g/t Au over a true width of 14 meters.
Sign in to your account