Hole ends in mineralization, with final 66.0 m of hole averaging 1.46 g/t Au and final 21.0 m averaging 1.93 g/t Au.
In addition, localized gold intersections at Gracie target (4 km east of Valley) confirmed a second reduced-intrusion gold system to be targeted in phase 2 drilling in 2023.
Snowline Gold Drills 1.1 g/t over 161.0 M
Leave a comment